InvestingCongress
  • Investing
  • Business
  • Stock
  • Politics
Investing

Multiple Brines Horizons Intersected in Second Hole- Liberty Lithium Brine Project USA

by February 13, 2024
February 13, 2024

QX Resources Limited (ASX: QXR, ‘QXR’) is pleased to confirm that numerous brine aquifers* were successfully intersected in the second hole of a two-hole diamond drill (DD) program over the large scale Liberty Lithium brine project in California, USA.

Drillhole 2 has been completed at 443m depth; Brine sampling and geophysics are underway.Numerous brine aquifers were intersected between 90m and 295m depth in drillhole 2.Both diamond drillholes, located 4km apart, were centred over significant geophysical targets in magnetotellurics (MT) that inferred a series of conductive brine bearing aquifers.Results and interpretations from drillhole 1 are expected in mid-February, with drillhole 2 results in late March.

*Cautionary Statement: The intersection of brines does not imply that the brines are lithium bearing. Chemical analysis from an independent laboratory will determine lithium concentrations in a brine.

Brine sampling*and downhole geophysics of the second drill hole is underway. Specific aquifers are being sampled using packer sampling, with intervals determined from the downhole geophysical and geological logs. Lithium assay results with interpretations are expected from drillhole 1 in the coming weeks, with drillhole 2 lithium results in late March.

The second vertical diamond drill hole has been completed at 443.5 metres depth. Numerous brine aquifers varying in width from a few metres to 10 metres in width were intersected at 90m, 130m, 210m, 245m, and 295m†. Running sands, favourable for brine aquifers, were intersected at these same levels. Increased salinity suggests a favourable zone from 210m to 270m.

Fine grained sediments with sandy layers were common from the top of hole to 205m depth with gravels, conglomerates and coarse alluvial fan material below this to the base of the hole. The geology intersected reflected the anticipated target sequence as its similar in profile to the producing sequences of Albemarle’s nearby Silver Peak lithium brine producer in Clayton Valley USA1.

The second hole will be cased, with slotted casing in favourable aquifers to allow for further sampling and monitoring. Large brine sample volumes (>20,000 litres) will then be pumped and stored. Bulk volumes of brine will be submitted for analysis and testwork with various direct lithium extraction (DLE) providers (refer ASX announcement dated 25 October 2023).

QXR Managing Director, Stephen Promnitz, said: “Intersecting numerous brine aquifers in the second hole is very encouraging. The running sand horizons and numerous saline aquifers encountered are exactly the desired geological setting when exploring for new lithium brine basins. Additionally, the geology in the second hole is very similar to the producing sequences at the nearby lithium brine producer of Albemarle.

The sampling undertaken is quite specific, using a packer sampler to take samples over individual aquifers from 3m to 10m thick. Bulk samples will be sent for direct lithium extraction testwork once collected.

It’s taking a little longer than anticipated to get assays and interpret those results due to end-of-year issues but It’s a great start to this large target Liberty Lithium project.”

Packer Sampling

Packer sampling, using “straddle” packers, are being utilised to sample specific aquifers downhole. Within the open drillhole, below the drill bit head, rubber stoppers are inflated either side of the specific aquifer between 3m to 10m, with intervals determined from the resistivity and gamma downhole geophysical log together with the geological log, where brines were identified (see Figure 2).

Drillholes and Deal Terms

The first vertical diamond drill hole was completed at 369 metres depth in late December 2023. Target horizons were intersected at 49m depth and 329m depth†. Fine grained sediments, gravels and coarse alluvial fan material were intersected down the length of the hole.

Drillhole 2 is located 4km to the south of drillhole 1 and both are centred over significant MT geophysical targets interpreted as inferring a series of conductive brine bearing aquifers at depth. Both holes are positioned within an extensive lithium brine surface anomaly of over 10km defined in auger samples (see image 4 below).

QXR has the ability to earn a 75% interest of the 102km2 Liberty Lithium Brine Project, located in SaltFire Flat, in California, USA (refer ASX announcement dated 5 October 2023). The Project is one of the largest single lithium brine projects in the USA (for scale, equivalent to 2x area of Sydney Harbour). The Project’s geological setting mirrors Albemarle’s nearby Silver Peak lithium brine producer in Clayton Valley USA1.

Click here for the full ASX Release

This post appeared first on investingnews.com
previous post
E-Power Drills 23.97 % Cg over 5.15 Metres at the Tetepisca Graphite Property, North Shore Region, Québec
next post
Senate passes $95 billion Ukraine, Israel aid package amid GOP divide

You may also like

Crypto Market Recap: Coinbase Launches Stablecoin Payments, Arizona...

June 20, 2025

Allied Critical Metals: Advancing Tungsten Projects in Portugal

June 20, 2025

E-Power Resources Inc. Announces Closing of Oversubscribed Hard...

June 20, 2025

Canadian Investment Regulatory Organization Trade Resumption – CYG

June 20, 2025

Galan Lithium Limited: A$20 million Placement to Strategic...

June 20, 2025

Mali Court Seizes Control of Barrick Gold Mine...

June 20, 2025

Critical Metals Secures US$120 Million Loan LOI for...

June 20, 2025

Prospectus

June 20, 2025

A$20 Million Placement to Strategic Partner

June 20, 2025

Heritage Mining Provides Corporate Update

June 20, 2025
Join The Exclusive Subscription Today And Get Premium Articles For Free

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    Recent Posts

    • Crypto Market Recap: Coinbase Launches Stablecoin Payments, Arizona Moves Closer To Bitcoin Reserve Bill

      June 20, 2025
    • Allied Critical Metals: Advancing Tungsten Projects in Portugal

      June 20, 2025
    • E-Power Resources Inc. Announces Closing of Oversubscribed Hard Dollar and Flow-through Private Placements

      June 20, 2025
    • Canadian Investment Regulatory Organization Trade Resumption – CYG

      June 20, 2025
    • Galan Lithium Limited: A$20 million Placement to Strategic Partner

      June 20, 2025
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 investingcongress.com | All Rights Reserved

    InvestingCongress
    • Investing
    • Business
    • Stock
    • Politics